EV Charger Installation Certificate: What Electricians Must Issue

What to complete after fitting a domestic EV charge point: which certificate to issue, the charger details to record, the tests to log and how to notify the work.

If you've fitted a domestic EV charge point, the install isn't finished until the paperwork is. That means the right certificate for the work, the charger-specific details recorded, test results that match the circuit actually installed, and the job notified.

Zappy sells the Pro Tools covered below, so treat the tool sections as our view. The certificate content applies whatever software or paper forms you use. Check requirements against BS 7671 (Section 722 covers EV charging), the manufacturer's instructions and your competent person scheme.

Which certificate does the job need?

A charger on a new dedicated circuit is new work, so it gets an Electrical Installation Certificate (EIC). That covers most domestic installs: new cable from the consumer unit, new protective device, new circuit.

A Minor Works certificate fits smaller jobs that add to or alter an existing circuit without creating a new one. For chargers that's uncommon. A like-for-like swap on an existing dedicated circuit might qualify, but only if you've verified the circuit is still suitable for the new unit. If you're unsure, our guide to EIC vs Minor Works has worked examples.

EIC or Minor Works for this charger job?

• What did you do to the circuit?

• Have you verified the existing cable, protection and earthing suit the new unit?

• A new circuit is new work, so an EIC is the usual certificate. Complete the EV charge point details too.

• A like-for-like swap with no change to the circuit can fit a Minor Works certificate. Record the tests you did, and check your scheme's guidance.

• Section 722 expects a charge point to have its own dedicated final circuit, so check the design with a qualified electrician before certifying. See EIC vs Minor Works.

• Check the circuit's suitability for a continuous EV load before choosing paperwork. If in doubt, treat it as new work and use an EIC. See EIC vs Minor Works.

The paperwork to complete after a domestic install

Typically that's three things:

• The EIC (or Minor Works certificate) with design, construction, and inspection and test sections, plus the schedule of circuit details and test results.

• The EV charge point details, recording the charger's make, model, rating, protection and earthing arrangement. Zappy Pro Tools has an EV charge point certificate for this.

• Building Regulations notification.

Notification

In England and Wales, installing a new circuit for a charge point in a dwelling is notifiable building work (Part P in England, with Wales following its own Approved Document P). You notify either through your competent person scheme or through local authority building control. Scheme members typically notify online and the scheme issues the Building Regulations compliance certificate to the customer. For deadlines and what counts as notifiable, see our building control notification guide.

Tests and readings to record

The schedule of test results should reflect what you actually measured on this circuit. For an EV circuit, make sure you've covered:

• Continuity of protective conductors (R1+R2 or R2) for the new circuit.

• Insulation resistance between live conductors and to earth.

• Polarity.

• Earth fault loop impedance (Zs), checked against the maximum permitted for the protective device. Record the measured value, not the tabulated one.

• Ze and prospective fault current at the origin.

• RCD results, including the type and rating of the device protecting the charger circuit and its trip times. Section 722 sets requirements on RCD type and DC fault protection, either in the charger or upstream, so note where that protection sits.

• Earthing arrangement. If the supply is TN-C-S (PME), record how you've dealt with the open-PEN risk: the charger's built-in protection, an earth electrode, or another permitted solution. Note the electrode resistance if you fitted one.

Load and diversity notes

Record the charger's rated current, the circuit's protective device rating and cable size, and any load management in use. Note your assessment of maximum demand for the installation, and whether the supply and main fuse suit the added load. Check whether the DNO needs notifying or approving for the added load, and record what you did.

Common mistakes

• Blank fields. A missing Zs, RCD time or circuit reference looks like an unfinished test. Use N/A or LIM where a box genuinely doesn't apply, and only there.

• Wrong circuit details. Cable size, installation method or device rating copied from another job. Re-check them against what's in the wall.

• Earthing recorded as "PME" with no protection method. Say what you did about it.

• Wrong RCD type or no note on DC protection.

• Certificate issued, notification forgotten. Track both together.

• Filling the schedule at the van after the fact. Transcription errors creep in.

Completing and sending from site with Zappy Pro Tools

Start an EIC for the job, add the EV charge point details, and work through the circuit sheet on your phone. Tap a box and type straight into it. The keyboard bar offers the column's common values, arrows, a box menu and Done, so you can move through the schedule without leaving the keyboard.

For several boxes at once, tap a box and drag the dot on its corner to select a block. Tapping inside the selection lets you fill blanks with LIM, N/A, N/V or ---, fill down, copy, paste, or use Undo. Fills and paste only go into empty boxes, so readings you've already typed aren't overwritten. That's useful for marking the boxes that don't apply on a single-circuit schedule, but the readings themselves still come from your instrument.

Zappy doesn't test, and it can't decide whether a reading passes. You enter the values and you sign the certificate. See our guide to electrical certificate apps for more on completing certificates on site.

Copy this checklist

After an EV charger install

• Chose EIC (new circuit) or Minor Works (suitable existing circuit)

• Charger make, model, rating and protection recorded

• Cable size, method and device rating match what's installed

• Continuity, insulation resistance and polarity recorded

• Measured Zs, Ze and PFC recorded

• RCD type, rating and trip times recorded

• Earthing arrangement and PME protection method noted

• Maximum demand and load management noted

• No unexplained blank boxes

• Certificate signed and sent, building regulations notification made

FAQ

Does a charger swap need a new certificate? You still need to document the work. Whether that's a Minor Works certificate or an EIC depends on whether the circuit changed and whether you've verified it suits the new unit.

Who sends the Building Regulations certificate? If you notify through a competent person scheme, the scheme issues it. If you use building control, the council does.

Can I use the same certificate for the charger and the consumer unit? If you changed the consumer unit as well, that's a separate piece of notifiable work. Check how your scheme wants it recorded, and see Zappy Pro Tools for the certificate types available.

If you're after more EV work, join Zappy for leads.

Start free: the app for UK electricians
Zappy